Industrial Dam Drying Slab – Dalrymple Bay Coal Terminal

Expansion of Dalrymple Bay Coal Terminal’s Coal Fines Drying Facility

For environmental reasons, Dalrymple Bay Coal Terminal (DBCT) must ensure the retention and collection of water borne coal fines at its terminal.  After a number of drains, dosing plant, dams and collection pits, the fines are extracted and dried on a concrete drying slab.  In 2022 it was identified that the current drying capacity needed to be increased.  DBCT engaged Seaforth Civil to construct the new drying slab and retaining wall.

Project included:

    • Removal of existing concrete retaining wall;

    • Earthworks including removal of material and supply and import of approved fill material and grading of surface levels to design;

    • Construct new concrete slab adjacent to existing;

    • Construct retaining wall including drainage system;

    • Backfill to tie-in to existing road.

2022 Dalrymple Bay Earthworks

Ready to bring your project to life? Get in touch with Seaforth Civil today to discuss how our expertise in civil construction, earthworks, and project management can drive your project to success.

Let’s collaborate to build sustainable and innovative infrastructure solutions together.

    Get in touch